China Construction Project
TIME:2025-04-23 VIEWS:135
Room type: Folding room
Quantity: 200 sets
Purpose: Engineering campsite/temporary accommodation
The folding box house adopts a galvanized steel frame and patented profile hinges, without the need for foundation construction on site. Three people can complete a single set of unfolding installation within 20 minutes, with a daily installation volume of 600 square meters, which is 30% shorter than the traditional activity board house construction period.
Room type: Folding room
Quantity: 200 sets
Purpose: Engineering campsite/temporary accommodation
The folding box house adopts a galvanized steel frame and patented profile hinges, without the need for foundation construction on site. Three people can complete a single set of unfolding installation within 20 minutes, with a daily installation volume of 600 square meters, which is 30% shorter than the traditional activity board house construction period.
- Previous Article:Zongyang Hengbu Shanghai Bureau Project
- The Next One:China Railway Second Bureau Project
Hotline:

