CASE
—— CASES
Anhui Zeyu has been dedicated to the development of high-quality containers for 11 years

China Communications First Harbor Engineering Corporation Qingyang Port Project

TIME:2025-04-23 VIEWS:145


Room type: Folding room

Quantity: 500 sets

Purpose: Office space/temporary accommodation

The main body of the container room adopts a combination structure of galvanized steel frame and rock wool sandwich panel, with a wind pressure resistance level of ≥ 5kPa and seismic performance meeting the requirements of level 8 intensity, effectively responding to the complex environment of the port area.



Room type: Folding room

Quantity: 500 sets

Purpose: Office space/temporary accommodation

The main body of the container room adopts a combination structure of galvanized steel frame and rock wool sandwich panel, with a wind pressure resistance level of ≥ 5kPa and seismic performance meeting the requirements of level 8 intensity, effectively responding to the complex environment of the port area.